Exterior construction works (walls, stone, hangers and warehouses)
Interior partitioning and installing gypsum boards and fabricated partitions (Cleanroom
partitions) in a manner that achieves the required Room Classification as per the
requirements of GMP, GDP and ISO14644 in terms of environmental safety and pressure
differences in accordance with the set specifications that comply with local
requirements as well as European and American requirements (Eudralex vol.4 and
CFR21 respectively).
Decoration works including painting, flooring, ceiling, entrances, dressing rooms,
gypsum and other interior decoration works.
Construct, maintain and install systems of air conditioning and steam generation